Bunn G2 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Moedores de café Bunn G2. Bunn G2 User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
BUNN
®
G1,G2
G1,G2
& G3
& G3
OPERATING & SERVICE MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
10191.0000Q 1/00 ©1995 Bunn-O-Matic Corporation
C
L
EA
N
IN
G
L
E
V
E
R
CLEANING LEVER
GROUND
COFFEE
1. S
elect the desired grind.
2. Lift the lid and pour coffee beans into the hopper.
3. Slip bag under the chute. Rest the bag on the tray.
4. P
ress the start sw
itch.
5. Flip the cleaning lever a few
tim
es as dispensing slow
s.
6. Rem
ove the bag. The grinder w
ill stop autom
atically.
S
T
O
P
T
U
R
K
IS
H
S
P
E
C
I
A
L
R
E
G
P
E
R
C
E
L
E
C
P
E
R
C
A
U
T
O
M
A
T
I
C
D
R
I
P
F
I
N
E
E
S
P
R
E
S
S
O
C
LE
A
NING
LE
V
E
R
CLEANING LEVER
GROUND
COFFEE
S
TO
P
TU
R
KIS
H
S
P
E
C
I
A
L
R
E
G
P
E
R
C
E
L
E
C
P
E
R
C
A
U
T
O
M
A
T
I
C
D
R
I
P
F
I
N
E
E
S
P
R
E
S
S
O
1. Select the de
sired grind
.
2. Lift the lid and pour coffee beans into the h
op
per.
3. Slip bag un
der the chute. R
est the bag on the tray.
4. Press the start sw
itch
.
5. Flip the clean
ing lever a few tim
es as dispensing slows.
6. Rem
ove the bag. The grinder w
ill stop autom
atically.
Vista de página 0
1 2 3 4 5 6 ... 21 22

Resumo do Conteúdo

Página 1 - BUNN-O-MATIC CORPORATION

BUNN®G1,G2G1,G2& G3& G3OPERATING & SERVICE MANUALBUNN-O-MATIC CORPORATIONPOST OFFICE BOX 3227SPRINGFIELD, ILLINOIS 62708-3227PHONE: (217)

Página 2 - INTRODUCTION

10If voltage is present as described, proceed to#5.If voltage is not present as described, refer tothe Wiring Diagrams and check the grinder wir-ing

Página 3 - BEFORE GRINDING

1111. Clean all grinding burrs and mounting surfacesbefore reassembly.12. Install the four .250"-20 cage nuts on the newmotor.13. Place the new m

Página 4 - CLEANING

12SERVICE (cont.)

Página 5 - ADJUSTMENT

1317. Install grind selector dial plate (18) with adjust-ing screw w/bearing (19) onto the grind cham-ber and secure with two .250"-20 screws (1)

Página 6 - TROUBLESHOOTING

14SERVICE (cont,)DC MOTOR AND GRIND CHAMBER - G1MD ONLY(cont.)BLU to BLU from RectifierBLU to WHI/BLU fromRelay (3)RED to Rectifier (-)BLK to Rectifie

Página 7 - TROUBLESHOOTING (cont.)

15SERVICE (cont,)DC MOTOR AND GRIND CHAMBER - G1MD ONLY(cont.)

Página 8

16Location:The Off/On/Start switch is located in the up-per front wrapper above and to the right of the grindselector knob (left side when viewed from

Página 9

17+ACACSERVICE (cont.)Removal and Replacement:1. Disconnect the wires from the rectifier.2. Remove the #10-32 screw securing the rectifierto the motor

Página 10 - SERVICE (cont,)

18Location:The relay is located on the grinder base insidethe lower housing.Test Procedure:1. Disconnect the grinder from the power sourceand place a

Página 11

19WHI/BLU fromMotor to RelayK-4WHI/ORN from BagSensor Switch (A)WHI/ORN from BagSensor Switch (A)WHI/BLU fromMotor to RelayK-4WHI/RED fromSwitch to Re

Página 12 - SERVICE (cont.)

2INTRODUCTIONThis equipment will grind whole bean coffee to a user-selectable setting and dispense it into a bag. Theequipment is only for indoor u

Página 13

20SW2WHI/VIOWHI/VIOBLUWHI/ORAASCHEMATIC WIRING DIAGRAM G1-MDGRNL1NSW1BLK WHI/REDKB120 VOLTS AC2 WIRESINGLE PHASE 60 HZ 10621.0000C 10/98 © 1992 BUNN-

Página 14

21WHI/VIOWHI/VIOWHI/BLUWHI/ORAASCHEMATIC WIRING DIAGRAM G1A, G2A & G3AGRN/YELL1L2SW1BLKWHI/REDWHI/REDSW2N.O.N.O.BML1L2RED (230V)RED/BLK (240V)RED

Página 16

3TURKISHSPECIALREGPERCELECPERCAUTOMATICDRIPFINEESPRESSOUse only on a properly protected circuitcapable of the rated load.Electrically ground the chass

Página 17

4ELECTRICAL REQUIREMENTSThe 120 volt and 240 volt grinders have an attached cordset and requires 2-wire, grounded service rated 120volts ac and 240 vo

Página 18

5COFFEE GRINDING1. Turn the selector knob to align the red arrow with the desired grind.2. Raise the top lid and add the whole bean coffee. Close the

Página 19

6A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problemsencountered. If the problem remains after ex

Página 20 - SINGLE PHASE 60 HZ

7TROUBLESHOOTING (cont.)PROBLEMGrinder will not start. (cont.)Grinder will not shut off.PROBABLE CAUSE3. Bag Sensor. (cont.)4. Motor overload protecto

Página 21 - (Revised January 2000)

8TROUBLESHOOTING (cont.)PROBABLE CAUSE1. Hopper2. Entrance to grind chamber3.Shear PlatePROBLEMGrinder starts, but will not dis-pense.REMEDYCoffee mus

Página 22

9CONTENTSBag Sensor Switch ............ 9Motor and Grind Chamber (AC)....... 10Motor and Grind Chamber

Modelos relacionados G1

Comentários a estes Manuais

Sem comentários