Bunn DUAL GPR-DBC Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Preparadores de café Bunn DUAL GPR-DBC. DUAL / GPR-DBC - Webstaurant Store Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 7
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit
the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain
the latest catalog and manual updates. Contact Bunn-O-Matic Corporation at 1-800-286-6070 to obtain
a paper copy of the required Illustrated Parts Catalog mailed via U.S. Postal Service.
37614.0000E 04/10 ©2004 Bunn-O-Matic Corporation
INSTALLATION & OPERATING GUIDE
CA U
T
I
ON : W
AR M ER S
AN D S U
RF AC ES A R E
H
O
T
S
M
A
R
T
F
U
N
N
E
L
S
M
A
R
T
F
U
N
N
E
L
DUAL / GPR-DBC
WITH SMART FUNNEL
®
Vista de página 0
1 2 3 4 5 6 7

Resumo do Conteúdo

Página 1 - DUAL / GPR-DBC

BUNN-O-MATIC CORPORATIONPOST OFFICE BOX 3227SPRINGFIELD, ILLINOIS 62708-3227PHONE: (217) 529-6601 FAX: (217) 529-6644To ensure you have the latest

Página 2 - INTRODUCTION

Page 2INTRODUCTIONThe brewer incorporates a wireless interface system that allows the DBC Grinder to load certain information into the "programmi

Página 3 - MAIN ON/OFF

Page 300656.000100986.000000658.000020201.5600USER NOTICESThe notices on this brewer should be kept in good condition. Replace unreadable or damaged

Página 4 - ELECTRICAL HOOK-UP

Page 4L2 WHITE/VIOLETWHITENEUTRALL1 BLACK120 V.A.C.120 V.A.C.208 OR 240 V A.C.P1841 Requirements for brewers without an attached cord set are as foll

Página 5 - INITIAL SETUP

Page 5PLUMBING REQUIREMENTSThis brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a

Página 6 - OPERATING CONTROLS

Page 6OPERATING CONTROLS bbc cddefghhjP3268.25MAIN ON/OFFSWITCHaOPERATING CONTROLS(a) MAIN ON/OFF SWITCH This switch, located under the brewer behind

Página 7 - CLEANING

Page 7COFFEE BREWING1. Select the desired batch size on the grinder. It is not necessary to select a size on the brewer.2. Insert a BUNN filter into

Comentários a estes Manuais

Sem comentários