Bunn Dual TF BrewWISE DBC Guia de Resolução de Problemas

Consulte online ou descarregue Guia de Resolução de Problemas para Preparadores de café Bunn Dual TF BrewWISE DBC. Bunn Dual TF BrewWISE DBC Troubleshooting guide Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - TECHNICAL TRAINING

BUNN® TECHNICAL TRAININGThermoFresh BrewWISE® DBC

Página 2

TF BrewWISE® Training Manual10 Enter new number for each bypass valve, after doing CALIBRATE FLOW and measuring output. Enter n

Página 3 - Unit 1 installation

Bunn-O-Matic Corporation11LEFT OZ 36.0QUIT YESCALIBRATE FLOW ?NO YESSPRAY HEAD CAL ?NO YESStep4:Toactivatetheowratecheck,presst

Página 4 - Installation

TF BrewWISE® Training Manual12Calibrating the Temperature Sensing ProbeNote: Calibrating the temperature sensing probe (thermistor) should be done whe

Página 5 - Electrical Install

Unit ObjectivesUnit 3 Machine coMpositionGiven a realistic scenario in which the learner has access to the machine’s internal components the learner

Página 6

TF BrewWISE® Training Manual14Machine CompositionExterior OverviewProduct Outlets and Removable Parts• User interface (1)• Display (mounted to the c

Página 7 - Unit 2 setup

Bunn-O-Matic Corporation15Machine Function and OperationsMain Control BoardThe main control board is the brain of the brewer. In the Digital Brewer Co

Página 8 - Setup and Programming

TF BrewWISE® Training Manual16Heating SystemThe heating system consists of:• Water tank• Heating elements• Triacs• Contactor (3 phase only)• High

Página 9 - Level 2 Programming

Bunn-O-Matic Corporation17Dispensing SystemThe dispensing system consists of:• Brew valve• Bypass valve• Sprayhead• Funnel• Funnel lock solenoids

Página 10 - Level 3 Programming

Unit ObjectivesUnit 4 preventive MaintenanceGiven a realistic scenario depicting a machine requiring a preventive maintenance, the learner will be ab

Página 11 - Today’s S pecial

Bunn-O-Matic Corporation19Preventive MaintenanceIn order to maintain proper operation and long service life BUNN recommends performing the preventive

Página 12 - (-) (+)DONE

IndexUnit 1: Installation Site Requirements ...

Página 13 - Unit 3 Machine coMposition

TF BrewWISE® Training Manual20 □ Clean any mineral build-up from the valve □ Reassembly is the opposite of disassemblyStep6:Cleanthetankttingst

Página 14 - Brew Start Switch

Unit ObjectivesUnit 5 troubleshootingGiven a realistic scenario depicting a broken machine, the learner will be able to effectively troubleshoot, dia

Página 15 - Bunn-O-Matic Corporation

TF BrewWISE® Training Manual22Troubleshooting and RepairService ToolsThe BrewWISE® brewer features on-board troubleshooting. Since all of the machine’

Página 16 - Training Manual

Bunn-O-Matic Corporation23Test SwitchesPress any of the input buttons on the membrane switch, the display will show which button is being pressed.Test

Página 17 - Sprayhead

TF BrewWISE® Training Manual24Operator Fault MessagesThe following fault messages will appear on the display if the operator needs to take corrective

Página 18 - Unit Objectives

Bunn-O-Matic Corporation25Equipment will not operate. 1. No power or incorrect volt-age.Measure the voltage at the terminal blockandconrmthatitm

Página 19 - Preventive Maintenance

TF BrewWISE® Training Manual26Water will not heat or display shows HEAT-ING TIME TOO LONG, (Cont.)2. Tank Heaters Remove power from the brewer. Check

Página 20

Bunn-O-Matic Corporation27Inconsistent beverage level in server. (Cont.)3. brew valve Test the Brew Valve. Turn the valve on for 30 seconds and collec

Página 21 - Unit 5 troubleshooting

TF BrewWISE® Training Manual28Weak beverage. (Cont.) 5. Water temperature Empty the server, remove its cover, and place the server beneath the sprayhe

Página 22 - Troubleshooting and Repair

Bunn-O-Matic Corporation29Triac Map1. Left Funnel Lock2. Right Funnel Lock3. Left Transformer4. Left Dispense Valve5. Right Dispense Valve6. Left Bypa

Página 23 - Service Fault Messages

Unit ObjectivesUnit 1 installationGiven a realistic scenario depicting a new site install, the learner will be able to install and setup the brewer f

Página 24 - 1-800-286-6345

Unit Objectives©Bunn-O-Matic Corporation, 2011. All rights reserved. Bunn-O-MaticCorporation-1400StevensonDrive- Springeld,IL627

Página 26

TF BrewWISE® Training Manual4InstallationSite RequirementsSpace• Single TF BrewWISE - Counter able to support the weight of the machine, approximate

Página 27

Bunn-O-Matic Corporation5Electrical InstallRefer to the electrical section of the machine’s data plate to select the proper power cord, plug and recep

Página 28

TF BrewWISE® Training Manual6Units without a NeutralTheeld-switchableDualswillhaveaninternalstep-downtransformeranda2-polecontactorinad

Página 29 - Triac Map

Unit ObjectivesUnit 2 setupGiven a realistic scenario depicting a new site install, the learner will be able to install and setup the brewer for cust

Página 30 - Additional Resources

TF BrewWISE® Training Manual8Setup and ProgrammingThe BrewWISE® software is the latest evolution of BUNN’s digital brewer control (DBC®) system. The s

Página 31

Bunn-O-Matic Corporation9Level 1 ProgrammingPress and hold the right hidden switch until the display screen reads “Brew Lockout?” and release. This

Comentários a estes Manuais

Sem comentários